DSM-Firmenich Manufacturing Facility

CLIENT : PT. Firmenich Aromatics Indonesia
PROJECT LOCATION : Karawang, West Java
YEAR : 2025
CATEGORY : Industrial
DELIVERY METHOD : General Contracting

Description

This project involves a construction of a 2,000 m² industrial manufacturing facility building on a 3,175 m² lot.

Harjaguna’s scope comprises structural, architectural, and site work.

The building’s structure is a reinforced-concrete frame, with structural steel used for the roof support system. The facility features corrugated metal roofing across multiple interconnected bays, a blue and white architectural color scheme.

The interior finishes are built to industrial and food-grade standards, featuring high-gloss epoxy flooring, smooth-finished painted walls, sandwich panel walls and ceilings, gypsum and aluminum ceilings, aluminum-framed glazed doors, PVC strip curtains at transition zones, steel doors, and fire-rated emergency exit doors.

Site work included paved access roads, drainage infrastructure, fire hydrant and hose reel systems, and landscaped perimeter areas.

E-Catalog

*The content contained herein is copyright of PT. Harjaguna Kurniamitra. Any redistribution or reproduction of part or all of the contents in any form is strictly prohibited without any permission from the copyright holder. Please enter your email address and we will contact you soon.