Padma Resort Legian Chalet Refurbishments

CLIENT : PT. Puri Zuqni
PROJECT LOCATION : Legian, Bali
YEAR : 2019
ARCHITECT : PT. Bali Anugrah Dewata
CATEGORY : Hospitality
DELIVERY METHOD : General Contracting

Description

Located in Legian, Bali, this 20 Balinese-styled-chalet refurbishment project was divided into 6 phases over a period of 2.5 years.

Each chalet houses approximately 11 – 12 rooms, and in total there are 228 rooms.

The challenging aspect of the project was the schedules. Each phase was approximately 3 months and included 2 – 3 chalets. Noisy construction activities could only be carried out between the hours of 10 AM and 6 PM daily to minimize disruption to the resort guests.

The room types include 6 ground floor suites (70 m2), 6 upper floor suites (110 m2), 6 Junior Suites (73 m2), 208 deluxe rooms (50 m2), 2 handicap accessible rooms (48 m2).

Typical work on each room includes demolition of the existing interior finishes, afterwards along come new architectural finishes, new M/E rough-ins and finishes, and façade refinish.

The new finishes consist of new paints, new ceilings, teak parquet flooring, full body porcelain (homogeneous) tile floors, bangkirai/balau wood doors, freestanding and built-in teak- and oak-veneered furniture, and paras stone facade.

E-Catalog

*The content contained herein is copyright of PT. Harjaguna Kurniamitra. Any redistribution or reproduction of part or all of the contents in any form is strictly prohibited without any permission from the copyright holder. Please enter your email address and we will contact you soon.